Constructing , Operating and Upgrading of Transmission Lines Service
Constructing , Operating and Upgrading of Transmission Lines

TRANSMISSION LINES
Usman and Company has awarded various 200/132kV Transmission Line projects and competed successfully.
- As a NTDC approved Sub-Contractors. The construction of 220KV Transmission Lines including construction of Foundations, Erection, Stringing, Testing & Commissioning from UCH Power Plant to 220KV Sibbi Grid Station (ADB-201 – LOT-IV). Section-I, 56 Km.
- As a NTDC approved Sub-Contractors. The construction of 220KV Transmission Lines including construction of Foundations, Erection, Stringing, Testing & Commissioning from UCH Power Plant to 220KV Sibbi Grid Station (ADB-201 – LOT-IV). Section-II, 55 Km.
- The construction of 25 Km 220KV Transmission Lines including construction of Foundations, Erection, Stringing, Testing and Commissioning from Haveli Bahadur Shah Power Plant to 220KV Grid Station T.T Singh was completed by using its own Hydraulic Puller & Tensioner. Project completed with (JV) partner in remarkable time of period (GPP-04-LOT-I)
- The construction of 25 Km 220KV Transmission Lines including construction of Foundations, Erection, Stringing, Testing and Commissioning from Haveli Bahadur Shah Power Plant to 220KV Grid Station T.T Singh was completed by using its own Hydraulic Puller & Tensioner. Project completed with (JV) partner in remarkable time of period (GPP-04-LOT-II)
- Construction of Tower Foundations, RCC Pile Foundations of Poles, RCC Short Pile Foundations of (zm-30 & Ea+6+8) Towers, Erection, Welding of Towers/poles, Stringing, Testing & Commissioning, Dismantling and Mitigation Measures from Environmental Management and Monitoring Plan (EMMP) for Feed for 132kV Fateh Jang from 220kV Burhan Side Using Existing 66kV Route Through In & Out Arrangement From Idle Circuit 132kV Sangjani To Burhan (22 km).
- Civil Work, Erection, Stringing, Testing & Commissioning Of 220KV KSK-Bandala Double Circuit Transmission Line In & Out of both Circuits (Phase I&II) at proposed 220KV Grid Station Quaid-E-Azam Apparel Park Sheikhupura.
- Survey, Tower, Stacking, Foundation, Erection, Stringing, Testing and Commissioning of 132KV Jhimpir/T.M Khan Grid Station (37 Km).
- Construction of 132KV D/C Transmission Line including Survey, installation of conventional & Pile Foundation, Erection, Stringing of Thatta to Ghulam-ul-Allah Town. (24 Km).
- Construction of Towers Pile Foundations, Erection of Towers, Stringing, Testing and Commissioning of 132KV Interconnection Scheme of 50MW Zephyr Wind Energy.
- 132KV Transmission Line Tower Foundation, Erection and Stringing of Noshki – Dalbandin (37 Km).
- Construction of Tower Foundation & RCC Pile Foundation of Steel Tubular Poles, Erection & Stringing of 132KV T/Line for Conversion of 66KV To 132KV SDT T/Line (T-Off From 132KV Talagang To Danda Shah Bilawal.
- Construction of Tower Foundations, RCC Pile Foundations of Poles, RCC Short Pile Foundations of (ZM30 & EA+6+8) Towers, Erection, Stringing, Testing & Commissioning, Dismantling.
- Construction of Tower Foundations/RCC Pile Foundations of EA/EG/ED Type and Conventional Foundations of 132KV Towers, Erection, Stringing, Dismantling of Existing Towers, Conductor, for Remodeling Work of 132KV T/Line Mangla Power House.
- Construction of Tower Foundation, Erection, Stringing, Testing & Commissioning of 132KV T/line from 220/132KV Jhimpir G/S to Yunis Energy Limited 50MW (15 Km).
- Construction of Tower Foundation, Erection, Stringing, Testing & Commissioning of 132KV T/line from 220/132KV Jhimpir G/S to Metro 50MW (11 Km).
- 132KV T/L Survey Preparing Profile, Foundation Erection Stringing Testing & Commissioning of Sui-Dera Bugti Section-1 (22.5 Km).
- Construction of 132KV Tower Foundation, Erection, Stringing, Testing & Commissioning of D/C In & Out Basima (16.10 Km).
- 132KV T/L Tower Foundation Erection Stringing Testing & Commissioning of Noshki- Dalbandin (37 Km).
- Survey & Profile, Civil works, Erection, Stringing Testing & Commissioning of 132KV SDT T/L Pasni – Ormara (30 Km).
- 132KV T/L Tower Foundation, Erection Stringing Testing & Commissioning of Kohlu- Barakhan (27.85 Km).
- 132KV D/C T/L Construction Pile Foundation & Tower Foundation Erection Stringing Of Pattoki Chunnia (16 Km).
- 132KV T/L Survey Preparing Profile Construction of Tower Foundation, Erection Stringing, Testing and Commissioning Of Kashmor – Sui Section-II (22 Km).
- Construction of RCC Pile Foundation of Revised Rout of 132KV D/C T/Line Batapur-Shalamar Lot-III.
Usman and Company has honor to Construct numerous work of 220/132KV Transmission Line with NTDC & LESCO, FESCO, QESCO, SEPCO, HESCO & IESCO, the details there of is not possible to mention in this introduction.

Heading
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo. Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
- Lorem ipsum dolor sit amet,
- consectetur adipiscing elit.
- Ut elit tellus, luctus nec
- Lorem ipsum dolor sit amet,
- consectetur adipiscing elit.
- Ut elit tellus, luctus nec